Restoration diary

Reports of restoration work on 50029 and 50030.

Radiator lift additional pictures

When we originally reported on the installation of the overhauled radiators into 50030, we promised some more pictures showing what we did on the day. I took a lot of pictures during the lift day and we hope these will give an idea of everything that was done on the day, and why it was such a long day! ...
Continue reading
3335 Hits
0 Comments

Work party report 15th October 2017

Work party report 15th October 2017
​Carl Looker and his daughter Sofia put a third coat of black on the radiator room floor, than cleaned four of the rear mounting plates for the rad fan resistors which go above the walkways alongside the rads. There are three each side. The plates were only very lightly corroded as they get covered in dust and debris drawn in through the rad grille...
Continue reading
4083 Hits
1 Comment

Radiator lift from 50030

Radiator lift from 50030
We are grateful to a number of railway publications for publishing our press release at the start of 2017 describing the radiator lift from 50030.  We've deliberately held off putting anything on the Group website about this event in order to give the magazines some time to have exclusivity on the story. Now the story is well and ...
Continue reading
4212 Hits
2 Comments

Working party report 24th July 2016

​Dave Rolfe and I were on site today. Dave was freeing up one of the cab doors on Repulse while I carried on undercoating in the Thin Man's and over the cubicle inside the same locomotive.  Ian Kemp was on site the previous Saturday and they unbolted the remaining pipes and connections to the radiator fan currently inside 50030,...