RRRG new website top logo resized

 
Loading fan section
Here the roof panel is loaded, to the left is seen an ETH/Auxiliary Generator set which was planned to be used in 50029. However in 2010 we acquired a set which was in far better condition, relegating this one to the status of a repairable spare. 18th June 2009.
2009, 50030, June, June-2009, Peak Rail, Rowsley
2988 Sunday, 15 July 2012 16:23 Sunday, 15 July 2012 16:34