July 24th 2011

Dave was on site all weekend as usual, and was attempting to loosen the bolts on the radiators with an air-tool, but discovered it seems to be broken, so he went to remove some of the brake rigging from the spare bogies, but found all the bolts seized. Wes Needle paid a visit with his wife Keren & their two children on Sunday to look in on progress and take the family for a ride on the train. As I was working on 50008 last Sunday & therefore missed the workparty, I went up today & fitted the second small board behind the field divert contactors that houses the ETH detection relay HDR, the ETH earth fault relay HEFR & it's associated resistor Z62. I wired Z62 & HDR, but while wiring HEFR, I seem to have mislaid a wire from one of the ETH interlock relays, so finding it is the first job next time I am there.

Tags:
Continue reading
5158 Hits
0 Comments

July 16th-17th 2011

It was quite a busy weekend with Dave, Chris, Tom, Steve & Sarah attending both days and Ian, Pete & Mark on site Sunday. Toby the dog, who could become un-official mascot with regular site attendance, was also there!! Ian & Pete continued with the quest of torqeuing up the big end bearing caps, only a couple left to do.

Tom repaired/replaced as required all the runner timbers below the droplights. This completes all the internal frame repairs in both cabs.  The potentiometer stand in Renown was straightened, welded, cleaned and refitted by Chris - it had been damaged and bent during the removal of the ETH/aux gens before RRRG bought the locos. Dave continued cleaning up under the no1 cab floor in Renown, also assisited others.

Steve & Sarah continued identifying cut cables in Renown concentating at the cubicle end. They opened up the Battery Isolation Switch to identify cables, the rear section of the switch was removed to assist this process.

Mark removed floor-mounted conduits from the generator area in Repulse. The conduits will be replaced with those removed from 50040 prior to its scrapping. The cleared floor was cleaned.

Tags:
Continue reading
4220 Hits
0 Comments

June 26th 2011

Ian & Pete stretched another two pistons' worth of stretch bolts, before having to abandon this until a spanner can be bent, as the power unit internal structural webbing is now getting in the way of using the spanner properly. They then helped Dave loosen the bolts on the spare bogies to allow the traction motors to be removed sometime this year for overhaul. I test fitted the other two small boards that go behind the divert contactors, and found they fit easily. These two boards house the ETH overvolt relay HOVR & it's associated resistor Z24, the ETH voltage sensing resistor Z23, the ETH earth parallel resistor Z69, the ETH earth fault relay HEFR, & it's associated resistor Z62, and the ETH detector relay HDR. I bolted the left-hand board in place and wired in HOVR, Z23, Z24 & Z69.

Tags:
Continue reading
4324 Hits
0 Comments

June 20th-23rd 2011

Chris & Tom spent four days on site doing various jobs including repairing, straightening & painting the mounting pedestal for the load limiting pot, cabside corrosion repairs to No.2 cab of Repulse, collecting the spare auxiliary gen from Carnforth & taking it to a secure location, continuing to see if a new aux contact mechanism can be made for the reverser for Renown, creating shelving for me in the air filter area of Repulse and various other jobs.