Reports of restoration work on 50029 and 50030.

Announcement of working party dates and details of restoration work carried out at working parties.

Radiator louvre slats and mechanism finished, donor electrical cubicle wiring loom progress

Radiator louvre slats and mechanism finished, donor electrical cubicle wiring loom progress

Work on site over the weekend of 13-14 June comprised efforts by Dave Rolfe to finish off the last set of radiator grille louvre frames and slats.  These have now been sanded and painted ready to reinstall into 50030 and will mean the locomotive has a fully overhauled set of radiator slats, together with the mechanisms for actuating and moving the temperature-dependent sets fully overhauled and operational for the first time in many a year!

b2ap3_thumbnail_IMG_1081.JPG b2ap3_thumbnail_IMG_1080.JPG
b2ap3_thumbnail_IMG_1078.JPG b2ap3_thumbnail_IMG_1079.JPG

Also on site were electrical officers Andy Rowlands and Steve Tripp, together with Sarah McCall the membership secretary.  They carried on with the donor electrical cubicle. Following recent progress with removing the control units, attention turned to the wiring loom which we also intend to salvage in order to replace the damaged wiring in 50029.  Initially the complexity of the loom and its many tentacles proved frustrating but Steve and Andy have devised methods for transferring it into Renown. All the cabling in all the side sections of the cubicle, namely that for KV10s, relays and control units, has been pulled out of the frame or into the middle section where it is more accessible.  One more visit should have the whole wiring loom out and hopefully soon into its new home in 50029.  We can then consider our options for the bulky frame of the donor cubicle which is taking up valuable space on site.

Continue reading
14601 Hits
0 Comments

Work party report 29-30 June

Work over the weekend of 29-30 June involved stripping and painting the last of the louvre mechanisms for the radiators in 50030, hopefully to be refitted in 2-3 weeks.  Photos to follow.

Continue reading
7086 Hits
0 Comments

Spare electrical cubicle progress

Spare electrical cubicle progress

If you have been following RRRG for some time, you will remember that about a year ago we purchased and collected a number of spare electrical parts from the owners of 50021 Rodney.  Amongst these was the electrical cubicle originally in 50011 Centurion before that locomotive was scrapped.  Our reason for purchasing the cubicle was to use as a donor for rebuilding 50029's cubicle; as a rule of thumb the items that were removed from 50030 before we bought the locomotive were carefully unscrewed and the wiring in the electrical cubicle was in good condition.  The same cannot be said for 50029 unfortunately, with many of the cubicle wires having been cut.  To save the headache of pairing loose ends we aim to transplant the relatively intact wiring loom from the ex-Centurion cubicle into 50029.  That there were a good number of other components in the donor cubicle that would be useful for 50029 was a bonus.  The actual frame of the ex-50011 cubicle is however not in such good condition as the cubicle frame already in 50029: many of the catches for the doors are either bent or broken and it is obvious the cubicle has led a hard life since the locomotive it resided in was scrapped.  For this reason we cannot just swap the cubicles around between Renown and Centurion and a process of making one good one from two halves is necessary.

These pictures were taken on 9th June 2013 and show progress on the careful stripping of this cubicle and some of the parts we have recovered from it.  Electrical volunteers Steve Tripp and Andy Rowlands are shown at work but credit must also go to Julie Rollason and Sarah McCall for their invaluable assistance with this sub-project.

b2ap3_thumbnail_ST-cubicle-blog-image.JPG

b2ap3_thumbnail_AMR-ST-elec-cubicle-small.JPG


The complexity of the wiring loom is obvious from these pictures which show volunteers Steve Tripp and Andy Rowlands removing some of the last major components before we make a decision on how to tackle the wiring loom.  A good number of useful items have been recovered from this cubicle for re-use in 50029, as shown below.

 b2ap3_thumbnail_lighting-delay-timer.JPG  b2ap3_thumbnail_kv10-ex-50011-small.JPG

Shown below is one of the cubicle doors from the ex-50011 cubicle.  We have already refurbished the equivalent door and installed into 50030 and we have a better example in stock for 50029.  This is actually one of the better condition parts of the cubicle frame and speaks to the state that the ex-50011 electrical cubicle is in.

b2ap3_thumbnail_Rotary-switch-elec-cubicle-door-ex-50011-small.JPG

The next task is to assess the wiring loom in the 50011 cubicle and how best to remove it.  As the pictures show it is a many-tentacled monster and will require considerable thought as to the best way forward before we dispose of the frame of the 50011 cubicle.  With the size of the "thin man's passage" inside a 50 round the side of the electrical cubicle now not befitting our volunteers' physical profiles, we may also look to lifting the cubicle out of 50029 as a way of proceeding.

Continue reading
8373 Hits
0 Comments

Booths raid

A small RRRG party consisting of Sarah McCall and Steve Tripp visited Booths today to pick the remains of 47829 and 37428.  The pickings were unfortunately a bit thin as not much was left on these locomotives by the time they arrived at Booths.  The RRRG volunteers recovered a number of resistors (these are needed for Renown and we're getting closer to completing a full set), some insulators, turbo gauges and two dismantled arc chutes (complete ones were missing but these parts will help us repair our damaged examples) which made the day excursion worth it.  Well done to those who took the time to go along to Rotherham today.

Continue reading
6764 Hits
0 Comments

Workparty report for 2nd September 2012

Today I are be mostly...sorry been watching too many episodes of the Fast Show. Dave had spent the week on site as he's still off work following his operation & he's cleaned & painted most of the water & air inlet piping for the ex-008 power unit. Mark B dug out of the stores the two sections of protective shields for the A side generator conduits & cleaned and undercoated them; one each for 29 & 30. He also sorted a third section of the gen conduits, loosened off the joints and began removing years of layers of paint. I and my girlfriend Julie belled out and marked both sets of wiring from the cab AWS sunflowers to the AWS relay box, though removing the lid of the relay box proved difficult as two of the fixing bolt heads had been broken off some time ago, and I had to put an angle-grinder through the one stud to release the lid. I brought away the shaped mounting bracket from No.2 cab and the sunflower dial from No.1 cab to clean the contacts.

Continue reading
7346 Hits
0 Comments