Restoration diary

Reports of restoration work on 50029 and 50030.

Work party report 6th May 2019

Ian Kemp decided to go to site today as it was a bank holiday and he wasn't working. Wes Needle was available too so I went as well.Quite a productive day, Wes was in No.1 cab again, fitted the windscreen washer control and washer button he'd overhauled, and made a repair to a conduit under the floor. He took away a section of cab panelling to rep...
Continue reading
579 Hits
0 Comments

Work party report 10 March 2019

No 1 end cab 50030 with panelling refitted.
Bogie brake adjusters refurbished and ready for refitting to the bogies to replace worn adjusters removed previously.
A good day on Sunday, despite the Arctic wind in the morning. Wes Needle had a very productive day. He started the day by cleaning the debris from under No.1 cab floor on the second man's side. Then, with Dave's help, they checked the operation of the handbrake mechanism under the floor. They found that the pivot nut required tightening and a new s...
Continue reading
1117 Hits
0 Comments

Work party reports July/August 2018

The radiator compartment in 50030 following reinstallation of the overhauled radiators.
Deborah Stokes testing the voltage on the batteries still inside 50030.
The first two radiator fan resistor backplates were refitted on a test basis.
Deborah Stokes removed the batteries from 50030 to top up distilled water levels and attempt to charge them up.
The heat exchanger for the overhauled power unit intended for 50030 was overhauled last year and has now been fully installed complete with all pipework.
After four hours connected to a car battery charger, the voltage on the batteries doubled, although they won't be good enough to actually fire 50030 up.
I have been offline with PC problems for the last few weeks so work party reports haven't been added! So here's a bumper update rolling up all the work on site during the last month or so since the last report in mid July.The last three workparties saw myself, Dave Rolfe, Deborah Stokes, Wes Needle, Carl and Sofy Looker and Mark a...
Continue reading
1905 Hits
1 Comment

Working party report 24th June 2018

The no 1 end cab of 50030. This was last repainted about ten years ago when we first purchased the two locomotives and agreed with our hosts at Peak Rail that they should be repainted.
Ten years outdoors exposed to the elements hasn't been hugely kind to the paint job and the traditional cabside rot is starting to show. The aim is to do a quick repair job whilst the weather is fine and keep 50030 looking presentable and improve weather proofing.
A full repaint of 50030 isn't on the agenda for now as we concentrate on the mechanical aspects so we decided just to concentrate on removing rusty patches and getting primer onto the bare metal followed by undercoat to at least seal the repaired area away from the weather.
Mark Burrows and his Robert plus myself were on site today. Mark and Robert carried on where my partner Mae had got to on the no.1 end cabsides of 50030, removing rusty paint bubbles, grinding and sanding smooth where possible, then adding filler, sanding again and priming, then painting with grey undercoat. When purchased in 2002, both 50029 and 5...
Continue reading
2106 Hits
1 Comment

Work party report 3rd June 2018

Interior of the radiator fan compartment, showing the overhauled radiators that we recently reinstalled into 50030.
The two radiator fan resistor backplates fitted for spacing checks.
Two of the radiator drain cocks fully connected
​My fiancee Mae joined me on site today, along with Carl and Sofi Looker. While Mae was hammering, poking and scraping at rust spots around the lower parts of the no.1 cab on Repulse (a recent target area we had decided to tackle), Sofie was top-coating one side of the six radiator fan resistor backplates, while Carl and I lifted and bolted tw...
Continue reading
1322 Hits
0 Comments

Radiator lift April 2018

The very first step was to remove the mesh cover in the roof panel over the radiator fan.
Then the roof panel covering the radiator compartment could be lifted off to gain access to the radiator compartment itself.
The roof panel could then be lifted well clear of the locomotive and stored on the ground out of the way until it was ready to be replaced at the end of the lift.
We have previously reported on the work done in the radiator compartment of 50030 once the radiators were originally lifted out to allow the compartment to be refurbished. We had hoped that we would be able to lift the radiators back into 50030 following their refurbishment somewhat sooner than now but a combination of bad weather and oth...
Continue reading
1470 Hits
0 Comments

Work party report 11th March 2018

Work party report 11th March 2018
Radiator fan roof panel nearing completion of refurbishment.
Dave Rolfe and I were on site today. It was more of a sorting stuff out day than doing much actual work as it was my first day back since December. I did manage to clean off the sixth radiator fan resistor backplate and undercoat the second side of two that weren't done last time, and I grabbed a picture of the completed fan roof underside now it's...
Continue reading
2406 Hits
0 Comments

Work party report 15th October 2017

Work party report 15th October 2017
​Carl Looker and his daughter Sofia put a third coat of black on the radiator room floor, than cleaned four of the rear mounting plates for the rad fan resistors which go above the walkways alongside the rads. There are three each side. The plates were only very lightly corroded as they get covered in dust and debris drawn in through the rad grille...
Continue reading
1865 Hits
1 Comment

Work party report 8th October 2017

​Dave Rolfe and I were at Rowsley on Sunday 8th October: it was not the most successful of days but we got a bit done.We tried to take the radiator breather pipes off 50029, but she absolutely refused to help her sister and wouldn't relinquish said breather pipes. The bolts were just too rusted and tight, and the access to the bolts very restr...
Continue reading
1488 Hits
0 Comments

Work party reports 19th June, 27th August 2017

​19/6/2017 Deborah Stokes and I completed the rail grey topcoating in the radiator compartment, Dave Rolfe refitted another part of the radiator shutter actuating mechanism, while Wes Needle carried on in no 1 cab, refitting panelling to the driver's desk, though not without some effort as the panels were warped from storage and previous rushed fit...
Continue reading
1798 Hits
2 Comments

Work party reports 22nd August, 19th September

On 22nd August Dave Rolfe and I were on site. Dave was having a good sort out of our storage as it had got a bit untidy, which was preventing us from finding items we need for the actual restoration project, and disposing of offcuts of some wood that we don't need. I carried on undercoating in the Thin Man's and a bit round the front of the cu...
Continue reading
2171 Hits
1 Comment

Work party reports 30th November 2015 and 17th January 2016

Work party reports 30th November 2015 and 17th January 2016
The reverser for 50030 with the air connection temporarily attached to the actuator. We successfully operated the air valves from an off board compressor to prove we had the correct connections.
On 15th November, Ian, Pete and Dave continued filling the power unit with the new oil, checking for leaks along the way, and blanking off pipes that cannot be fitted before the PU is lifted back into Repulse. Dom and I continued belling out the electrical cubicle wiring, and completed all the cables from the compressor, rad fan, ...
Continue reading
2180 Hits
0 Comments

Working party report 25th October 2015

Working party report 25th October 2015
The work party was attended by Dave Rolfe and myself plus Mark Burrows in the morning. Mark dropped off a set of cab desk panels for me to take a look at, then spent the rest of the morning searching through our stores of other cab parts. The panels appear to be in good condition but are missing the speedometer.  We have this item in stock els...
Continue reading
2183 Hits
0 Comments

Working party report 20th September 2015

Ian Kemp, Peter Carter and Dave Rolfe removed pipework in Renown to get at, and remove, the fuel lift pump/alternator, which we need for Repulse, but not before it's been sent away for overhaul. (We often get asked why we don't strip Renown to help restore Repulse; the simple answer is that there isn't much on 50029 that we need for 50...
Continue reading
1729 Hits
0 Comments

Cab restoration update

At the last work party I attended I took home with me a number of items to repair/overhaul or look into replacements.The first items were a pair of air horn valves, two of which are our three spares.  Despite looking rather battered the first one (photo 1) was in generally good condition.  I stripped it down, gave it a good clean, sourced...
Continue reading
1758 Hits
0 Comments

Working party report 6th September 2015

A slightly frustrating day was had.  Ian, Dave and the mechanical team struggled all day to try and fit the last remaining piece of oil pipe to the power unit so they can pump oil round it, but despite cutting more and more off one of those big hardened steel plates holding the supporting sleepers together, they still co...
Continue reading
1583 Hits
0 Comments

Working party report 28th June 2015

Working party report 28th June 2015
This work party was attended by myself plus the "Three Amigos": Dave Rolfe, Ian Kemp and Peter Carter.  Dave and I fitted a couple more water and oil pipes to the ex-50008 power unit, I then swapped a water pipe from the power unit inside 50030 to replace a damaged one on the new power unit.
 
The main news from this Sunday centres around the heat exchanger which was removed from storage, due to the size and weight this was no mean feat but between the four of us and the use of our winch we managed to move it out for inspection. When we purchased the ex-50008 power unit we were told the heat exchanger had been swapped for the one currently in 50008 as it had a leak. When Ian inspected it, it was clear the end plate had corroded through in a couple of places (this plate is around 5mm thick so it's surprising it has rusted so badly). Thankfully the rest of the exchanger looks to be ok but we will need to pressure test it at some point. The rest of the afternoon was spent removing the end plate from the heat exchanger inside 50030; although this is quite rusty it appears to be in much better condition and should be easy(ish) to swap over.

 

 b2ap3_thumbnail_oil-pipe-and-gasket-med.jpg b2ap3_thumbnail_heat-exchanger-med.jpg 
Continue reading
2161 Hits
0 Comments

Working party report 31st May 2015

Working party report 31st May 2015

Ian Kemp, Peter Carter and Dave Rolfe carried on fitting oil, water and fuel pipework to the ex-50008 power unit, but on the side facing Renown, so no photo opportunities were possible today.

In preparation for the open day on June 21st, I washed down the outside of the electrical cubicle frame in 50030 and undercoated it, as it had become dirty from repeated handling since it was originally painted about five or six years ago. I also cleaned and undercoated the two cubicle doors from the fuse and MCB compartment. I brought three more cubicle doors home to clean.

b2ap3_thumbnail_010.JPG b2ap3_thumbnail_008.JPG 

Just a reminder that we are having our Open Day on the afternoon of Sunday June 21st where RRRG members will be on hand to give guided tours of the project and discuss progress. We hope to see you there!

Continue reading
1902 Hits
0 Comments

Working party report 24th May 2015

Working party report 24th May 2015

Ian Kemp, Peter Carter and Wes Needle continued fitting coolant and oil pipework to the power unit, while Dave Rolfe carried on painting the other side of the power unit.

a1sx2_Display_008.JPG

I removed the battery charge contactor so I could clean and undercoat the compartment where the CU2 and CU7 go, then did the same for the compartment underneath where the CU1 sits, in readiness for having them temporarily fitted for the open day. Topcoat will be applied next workparty. I also cleaned the dirtiest two of the cubicle doors ready for painting.

a1sx2_Display_005-2.JPG a1sx2_Display_006-2.JPG

Continue reading
1881 Hits
0 Comments

Working party report 19th April 2015

Working party report 19th April 2015

During the work party of 19th April Andy Rowlands connected up the reverser air piston coils and tidied up the cables in the electrical cubicle in 50030, then started investigating the severed cables under the main cubicle walkway. They appear to be from the DSD relay box but further investigation will be required to trace them exactly.

b2ap3_thumbnail_004.JPG b2ap3_thumbnail_006.JPG

Peter Carter and Ian Kemp together with Dave Rolfe continued fitting oil and water pipes to the ex-50008 power unit (see previous report, Power unit progress) in continued preparation for its use inside the overhauled 50030.

b2ap3_thumbnail_009.JPG b2ap3_thumbnail_010.JPG

 

Continue reading
2173 Hits
0 Comments